Orchestrator
Don't miss Orchestrate 2027 - one day event 
ManufacturingIndustry

Margin lost between quote and floor

You run a business on quotes, drawings and machines. We build the AI that carries your quoting, job math and production paperwork, on the floor with your team.

Scroll
The work we see

Where the shop loses margin

01

Quoting and job math by hand

Every quote starts from a blank sheet. Someone works out the material, the hardware and the labour one line at a time. Quotes go out late, and the person who knows the math is the bottleneck for every job.

02

Paperwork out of step with the floor

The quote says one thing. The work order and the bill of materials say another. The floor builds from whichever copy it has. The difference shows up as rework, and as margin nobody can explain.

03

Knowledge in a few senior people

Your best machinist knows which setup drifts and which supplier ships short. None of it is written down. Each avoidable mistake repeats, and the knowledge leaves when the person does.

What we build

Built for quotes, work orders and the shop

How an engagement runs

Ninety days, in the plant

A small squad works on site inside your operation. Usually that is an engineer, an AI engineer and a solutions architect. Map comes first, and the platform is picked on terms. Upskill, Assemble and Engineer then run at once.

01
Days 1 to 30

Map

  • Learn how your shop runs today
  • Document the workflows, quote to ship
  • Find the highest-value targets
  • Set success metrics and measurement dates
02
Days 31 to 90, alongside

Upskill

  • Teach the people who already do the work to use the platform properly
  • A fixed-scope curriculum with an assessment at the end
  • A champion on your team with protected time
03
Days 31 to 60

Assemble

  • Build inside the platform you already run. Skills, scheduled runs, managed agents and connectors.
  • Design them with the people who run the floor
  • Connect it to your systems of record
04
Days 61 to 90

Engineer

  • Custom development where reach, volume or a proprietary process justifies it
  • Put it into production against your systems of record
  • Keep a named owner and a plan for the day the model changes
  • Report against the metrics set in Map
Proof

Active in advanced manufacturing

Orchestrator runs an active engagement in advanced manufacturing.

Work With Us

We build the system and we train the team that runs it.

Tell us how one job runs today, from quote to ship.