AI's footprint is real, growing and local: grids, water supplies, power bills. Three levers: reduce calls, reuse what is computed, right-size the model and region. Here is the evidence, and what we do.

Scroll
REDUCEREDUCEfewer, leaner callsREUSEREUSEcache, don't recomputeRIGHT-SIZERIGHT-SIZEsmaller model, cleaner grid
0.24 Wh

Simple text prompt, Google's median Gemini prompt

Google measurement

150 to 700x

More GPU energy with reasoning switched on, same open model

Hugging Face

100x+

More emissions for the same workload on Alberta's grid than Quebec's

Orchestrator worked example

+50%

Growth in electricity at AI-focused data centres, 2025

IEA estimate

The Short Answer

The short answer

A simple text prompt is small. Google measured its median text prompt at 0.24 Wh, less than nine seconds of TV. Reasoning, agent and video requests can use hundreds or thousands of times more.

The total is large and growing. Data centres used about 485 TWh of electricity in 2025, about 1.5% of the world's total, up 17% in a year.

And the cost lands locally, on the grids, water supplies and power bills near the places data centres cluster.

Three Costs

Three costs, three boundaries

Each number below says what it counts. Many viral figures go wrong by mixing these up.

Power
485 TWh

Electricity used by data centres, 2025

About 1.5% of the world's electricity. AI-focused facilities used roughly a third of it (IEA data via Our World in Data). The IEA projects about 950 TWh by 2030.

Counts all data centres except crypto mining
Water
4.5 trillion L

Water consumed producing data centre electricity, 2025

This is water used to make the electricity, not water used in data centres. Cooling water is a separate count. In 2023, LBNL put US data centres at about 66 billion litres on site and nearly 800 billion litres through electricity.

Counts water used to make the electricity
Carbon
180 Mt CO2

Emissions from data centre electricity, 2024

About 0.5% of global combustion emissions. The IEA projects about 350 Mt by 2035.

Electricity only
Where It Lands

Where it lands

Global shares hide local strain. Three places show it.

Ireland23%

Irish data centres used 23% of metered electricity in 2025. All homes in Ireland together used 28%.

PJM, 13 US states and DC$325

The capacity auction has cleared at its price cap three years running, most recently at $325 per MW-day. It came up 6,831 MW short of its reliability target.

Alberta19,565 MW

About 19,565 MW of data centre load was seeking connection in July 2026, more than the province's record peak demand of 12,785 MW. Only 1,200 MW has been allocated.

The Ladder

Not every prompt is equal

The kind of work decides the footprint far more than the number of prompts.

Simple text prompt

Google median

Generated image

GPU only, 2024 benchmark average

Reasoning-scaled query

Microsoft Research median

Agent request with reasoning

GPU only, indicative (IEA)

Short AI video

GPU electricity, by model (ML.ENERGY)

  1. 01Simple text prompt0.24 WhGoogle median
  2. 02Generated image~2.9 WhGPU only, 2024 benchmark average
  3. 03Reasoning-scaled query~3.9 WhMicrosoft Research median
  4. 04Agent request with reasoning~50 WhGPU only, indicative (IEA)
  5. 05Short AI video~7 to 322 WhGPU electricity, by model (ML.ENERGY)
The steps use different boundaries. Google's figure covers its whole serving stack. The others count GPU energy or modelled servers. Compare orders of magnitude only.
Nine Claims

Claims, checked

You have probably heard some of these. Here is what the evidence says, including where the critics are right.

AI's electricity use is growing fast.TrueData centres used about 485 TWh in 2025, up 17% in a year. Electricity at AI-focused data centres grew about 50%. The IEA projects about 950 TWh by 2030, with AI-focused facilities more than tripling to about 465 TWh.Context and sources

The IEA figures cover all data centres except crypto mining. AI-focused facilities are part of that total.

Sources: IEA, Key Questions on Energy and AI; IEA, Key Questions on Energy and AI (Base Case); IEA, Key Questions on Energy and AI

Data centres are being powered by new gas plants.TrueThe IEA projects 15 to 27 GW of on-site gas plants for data centres by 2030. Most are in the United States. Some are running already. xAI has run dozens of temporary gas turbines at its Mississippi data centre.Context and sources

In Alberta, Meta's planned data centre is paired with a 932 MW gas plant. The IEA also tracks a 47 GW US pipeline of on-site gas projects, much of it only proposed.

Sources: IEA, Key Questions on Energy and AI; xAI Memphis updates; SELC; Government of Alberta; Meta info sheet; IEA chart

An AI question uses ten times the electricity of a Google search.Out of dateThat ratio paired a 2023 upper-bound estimate with a 2009 search figure. Current estimates put a simple text prompt at about 0.24 to 0.42 Wh.Context and sources
Every prompt drinks a bottle of water.OverstatedThe study behind it estimates about 500 mL for every 10 to 50 medium-length responses. It counts the water used to make the electricity. Google reports 0.26 mL of on-site water for its median text prompt.Context and sources

Both figures hold only with their boundary stated. Water stress depends heavily on where a data centre sits.

Sources: Li, Yang, Islam and Ren, Making AI Less Thirsty (arXiv v4; CACM 2025); Google (Elsworth et al.), Measuring the environmental impact of delivering AI at Google scale

Data centres already use 3% of the world's electricity.OverstatedData centres used about 1.5% of the world's electricity in 2025. The 3% figure is the IEA's projection for 2030.Context and sources

AI-focused sites used about a third of the 2025 total (IEA data via Our World in Data).

Sources: IEA, Key Questions on Energy and AI; IEA, Key Questions on Energy and AI (Base Case); IEA (2026) as charted by Our World in Data

AI is driving up my power bill.Partly trueThrough 2024 the evidence on household rates is mixed. EPRI found slightly lower residential prices in states where bundled utilities added data centres. A CEPR study linked more data centres since 2021 to higher residential prices at investor-owned utilities. In tight markets the pressure is clearer. PJM's market monitor attributes $29.4 billion of capacity charges over four auctions to data centre load. That is 46% of the total.Context and sources

A Rutgers analysis found no reliable effect on household bills through 2024. The CEPR study found no such link at co-ops or municipal utilities. In Alberta, the market watchdog says expected prices for 2029 and 2030 rose. It says that is largely because of data centre developments.

Sources: EPRI (Watten, Bistline, Blanford), Have Data Centers Raised Your Electric Bill?; Scalera, Bosetti, Pecci (CEPR DP21854; VoxEU); Garimella, Rutgers NJ State Policy Lab; Monitoring Analytics (PJM Independent Market Monitor); Alberta MSA, Wholesale Market Report Q2 2026

AI is draining water from places that need it.Partly trueWhere a data centre is built matters a great deal. A Bloomberg analysis found about two-thirds of new US data centres since 2022 sit in areas of high water stress. Microsoft drew half of its fiscal 2025 water withdrawals from water-stressed areas.Context and sources

In Uruguay, a project moved to air cooling after public outcry over water. In Chile, a court partly reversed a permit. That project was paused for redesign.

Sources: Bloomberg News, AI Is Draining Water From Areas That Need It Most; Microsoft 2026 Environmental Data Fact Sheet; Microsoft blog; DatacenterDynamics; Reuters; DatacenterDynamics; The Guardian

Efficiency gains will solve the problem.Not supportedEnergy per AI task has fallen at least tenfold a year in recent years. Electricity at AI-focused data centres still grew about 50% in 2025. Efficiency is real, and so far growth in use is larger.Context and sources

Google reports cutting the energy of its median prompt 33-fold in one year.

Sources: IEA, Key Questions on Energy and AI; Google

AI will save more emissions than it creates.Not supportedThe IEA projects AI could save about 3% of global final energy by 2035, if barriers are overcome. AI-driven growth could also raise energy demand 1% to 4%. No figure checked by an outside party shows a net saving.Context and sources

A company's avoided emissions are an estimate against a what-if case. They do not show its own emissions fell.

Sources: IEA (with OECD), Key Questions on Energy and AI; Google 2026 Environmental Report

Our Practice

How we work

Right-size the model

We default to the smallest model that does the job, and turn reasoning on only where it pays for itself.

Choose the region

We run workloads in the lowest-carbon region the client's data rules allow, where the client's platform offers the choice.

Cap agents

Our agents have hard limits on loops, retries and tool calls.

Cache and batch

We cache repeated answers.

Measure

We are adding model, token, region and request-type logging to every deployment.

Ask providers

Our procurement questions now ask providers for location-based carbon, water use and per-request energy.

Orchestrator is building Ember, which measures GPU fleets, and Pyra, right-sized open-weight tools for office work. That gives us a commercial interest in smaller and local models. So every claim about them on this page cites an outside source.

Six Choices

What you control

Six choices change an organization's AI footprint, and you can influence all of them.

01

Use the smallest model that does the job. In the IEA's indicative GPU benchmarks, a large open model used about six times the energy of a medium one per request. Reasoning or agent modes multiply that again.

02

Choose the hosting region. A hydro-heavy region can cut emissions by two orders of magnitude for the same workload.

03

Constrain agents. Cap loops, retries and tool calls.

04

Watch input length and media. Very long inputs raise energy sharply, and images or video cost far more than text, so generate media only when text will not do.

05

Cache and batch. Repeated answers should not be recomputed.

06

Ask your providers for location-based carbon, water use and energy per request. Make those questions part of how you buy.

Take a 100-person company sending 200 reasoning-heavy requests per person per day, 250 days a year. On Alberta's grid that emits about 6.5 tonnes of CO2e a year (3.6 to 11.8). On Quebec's 2024 grid it is about 41 kg (23 to 74), on preliminary data that moves with hydro output. The use level is an assumption. The count is electricity only, so real totals would be higher.

Work With Us

Want the arithmetic run on your own operation?

A 45-minute session on where the cost actually sits, before anyone talks about tools.

Sources

As of October 2026, reviewed quarterly. Generated from the figure IDs used on this page.

  1. A01AESO, Large Load Projects
  2. A02AESO; Government of Alberta
  3. A03AESO 2025 Annual Market Statistics; Government of Alberta
  4. A07Alberta MSA, Wholesale Market Report Q2 2026
  5. A08Government of Alberta, citing National Inventory Report 1990-2024 (2026)
  6. A09ECCC, National Inventory Report 1990-2024 (2026), Annex 7, Table A7-6
  7. A12Government of Alberta; Meta info sheet
  8. B03Orchestrator worked example, using Alberta (A08) and Quebec (A09) grid intensity; method in the full explainer
  9. C01IEA, Energy and AI
  10. C02, E01, E02, G01, Q09IEA, Key Questions on Energy and AI
  11. C07Microsoft 2026 Environmental Data Fact Sheet
  12. C12Google 2026 Environmental Report
  13. C18IEA (with OECD), Key Questions on Energy and AI
  14. E03IEA (2026) as charted by Our World in Data
  15. E04IEA, Key Questions on Energy and AI (Base Case)
  16. E05IEA, Key Questions on Energy and AI
  17. E13CSO Ireland, Data Centres Metered Electricity Consumption 2025
  18. G02IEA chart
  19. G06xAI Memphis updates; SELC
  20. P01PJM, 2028/2029 BRA Results Report
  21. P02PJM BRA reports
  22. P04Monitoring Analytics (PJM Independent Market Monitor)
  23. P06EPRI (Watten, Bistline, Blanford), Have Data Centers Raised Your Electric Bill?
  24. P07Garimella, Rutgers NJ State Policy Lab
  25. P09Scalera, Bosetti, Pecci (CEPR DP21854; VoxEU)
  26. Q01Google (Elsworth et al.), Measuring the environmental impact of delivering AI at Google scale
  27. Q03Google
  28. Q05Epoch AI, How much energy does ChatGPT use?
  29. Q06Microsoft Research (Oviedo et al.), Joule 2026 (arXiv 2509.20241 v2)
  30. Q07Jegham et al., How Hungry is AI? (arXiv 2505.09598 v6)
  31. Q08IEA, Key Questions on Energy and AI, Fig. 2.1
  32. Q10Luccioni, Jernite and Strubell, Power Hungry Processing (FAccT 2024)
  33. Q11ML.ENERGY Leaderboard v3.0; UNU-INWEH
  34. Q12Hugging Face, AI Energy Score v2
  35. W02UNU-INWEH, Environmental Cost of AI's Energy Use: Carbon, Water and Land Footprints (2026), pp. 10 and 32
  36. W05Li, Yang, Islam and Ren, Making AI Less Thirsty (arXiv v4; CACM 2025)
  37. W07Microsoft 2026 Environmental Data Fact Sheet; Microsoft blog
  38. W10LBNL, 2024 United States Data Center Energy Usage Report (2024), Sections 4 and 5
  39. W11Bloomberg News, AI Is Draining Water From Areas That Need It Most
  40. W13DatacenterDynamics; Reuters
  41. W14DatacenterDynamics; The Guardian
  42. X01de Vries (Joule 2023); IEA Electricity 2024 (Retired claim, corrected in Claims, checked)

Part of our Ethics commitments.